The money you save on a build is mostly made before the first shovel hits the ground. Here’s a practical pre-construction checklist for a Bay Area custom home or major remodel, in the order it matters.

1. Lock your program before you draw
Know how you live: how many bedrooms you need, whether you cook every night, where people gather. Changing the program after the drawings are done is cheap. Changing it after framing is expensive.
2. Set a real budget, with a contingency
Whatever your number is, hold back a contingency of at least 10–15%. Bay Area labor, permitting, and site conditions run higher than national averages, and even the national average change order starts around $2,500. Plan for surprises so they don’t become crises.
3. Get your plans scaled and finalized
Work with your architect or designer until the plans reflect what you want, layout, door swings, window placement, kitchen and bath fixtures. This is the cheapest place on earth to change your mind.
4. Walk your plans at full scale, before permits, if you can
This is the step most people skip, and it’s the one that saves the most. Standing inside your plan at true one-to-one scale is the only way to feel whether the hallway is wide enough, the island leaves room to move, and the primary suite is the size you pictured. A typical session surfaces 10 to 20 or more changes worth making, every one caught now is part of the design phase, settled before it becomes a change order later.
5. Line up permits and your contractor
- Permits: confirm what your city and county require. Bay Area timelines can run long, so start early.
- Contractor: choose a licensed builder you trust, and get a detailed, itemized bid you can check line by line.
- ADA and access: if any part of your project is a public or commercial space, confirm accessible clearances now.
6. Choose finishes before you’re rushed
Tile, flooring, counters, cabinetry, decide while you can still see them together, not under deadline pressure with the crew waiting. Our projection runs in full color, so you can see your actual finishes in the space at true scale before you order them.
The cheapest change is the one you make before anyone builds anything. Get your plans right, walk them at full scale, and you break ground already sure of what you’re building.Robin Nielsen, Founder