A change order is the most expensive sentence in construction: “Can we move that?” Here’s what it costs, and why the answer depends entirely on when you ask.

Cheap on paper. Expensive in the ground.
Every change has two prices. The first is what it costs to change the drawing, nothing. The second is what it costs to change the building, and that price climbs the moment work begins. The national average change order starts around $2,500. In the Bay Area, it’s usually far more, because our labor, permitting, and site conditions are more expensive than the national number assumes.
The reason a change gets so costly so fast is simple: the utilities. Once the slab is poured, the plumbing, gas, and electrical are already in the ground. Moving a wall now doesn’t just mean framing, it means re-running what’s underneath it.
Real numbers, from real builds.
Adding a window after the wall is up might run around $6,000. Moving an island that ended up too close to the counter, or relocating a utility line that’s already set, can run far more, tens of thousands of dollars, and on the big misses, into six figures. None of these were bad decisions. They were decisions made on paper, by people who couldn’t fully picture the room until they were standing in it.
“We tape out all the rooms, the appliances, the cabinetry, once the floor’s in. Clients always find changes, and at that point, on a real build, the utilities are already underground. Catch it during your session instead, and it’s part of what you’re already paying for, not a change order that costs you thousands.”Robin Nielsen, Founder
How to avoid one: decide in real life, while the change is still cheap.
You do it by walking the plan at full, one-to-one scale before construction begins, standing where the island goes, feeling the width of the hallway, catching the door you’d move once you felt it while it’s still just light on the floor. A typical session surfaces 10 to 20 or more changes worth making. Every one of them, caught then, is part of what you’re already paying for.
That’s the whole idea behind how a Walk Your Plans session works: move the expensive decisions back into the design phase, where changing your mind is part of the process.
Building or remodeling in the Bay Area? Tell us about your project and walk it before you build it.